delivery and installation of ODRA switchgear

delivery and installation of the ODRA switchgear in the Poznań Karolin CHP Plant 

delivery of 39 bays switchgear

delivery of 10 bays ODRA 35kV switchgear

delivery of 9 bays ODRA 35kV switchgear

delivery  of ODRA switchgear to Kamieńczyk electrical substation  in Jelenia Góra

extension to existing switchgear

delivery of ODRA switchgear

delivery and installation of ODRA switchgear

delivery of 91 bays switchgear

delivery of 13 bays switchgear

delivery of 12 bays switchgear

delivery of 17 bays switchgear

delivery of MV 20 bays ODRA switchgear for the modernised SE Kuźnica substation

delivery, installation and start-up of 15 bays 15kV switchgear and 21 bays 6kV switchgear 

delivery,  installation and start-up of 8 bays switchgear

delivery and start-up of 48 bays 6kV switchgear (type ODRA) and 54 bays 0,4 kV switchgear (type WARTA)

delivery and start-up of 20 bays 6kV switchgear (type ODRA) and 10 bays 0,4 kV switchgear (type WARTA)

delivery, installation and start-up of 3-section, 32 bays 6kV switchgear

prefabrication of the ODRA 12 medium-voltage switchgear, its assembly and startup

delivery of 40 bays switchgear

delivery, installation and startup of 24 bays switchgear

delivery of 8 bays 10kV switchgear

delivery of 16 bays 10kV switchgear

delivery of 39 bays 6kV switchgear

delivery of 20 bays 35kV switchgear

delivery of 8 bays switchgear

delivery of 10 bays 35kV switchgear

delivery of 10 bays 35kV switchgear

The website uses cookies

As part of our website, we use cookies to provide you with services at the highest level, including in a manner tailored to individual needs. Using the website without changing the cookie settings means that they will be stored on your end device. You can change your cookie settings at any time. More details in ours "Cookies policy".